Gardiner Creek, Footbridge
Scroll
Challenge
The biggest challenge on this project was to create a design that could be lifted into position, thus minimising construction time on site.
Solution
The steel framed bridge was fabricated off site and able to be lifted into position using a mobile crane with adequate reach. A proprietary balustrade system was adopted to reduce project costs.